JobOpsPro — Construction Operations. Simplified.
CompareSign in

Free Contractor Estimate Template

Enter your line items, set a markup on each one, and this template does the math: extended cost, marked-up price, subtotal, tax, and total. Download the finished estimate as a CSV or print it straight to PDF.

Estimate Details

Description Qty Unit cost Markup % Price Remove
$89.00
$297.00
$48.40
$241.80
$
%

Subtotal

$676.20

Tax

$49.02

Estimate total

$725.22

Your cost

$400.00

Gross profit

$276.20

Gross margin

40.8%

On the discounted subtotal

What Belongs On Every Estimate

A price alone is not an estimate. The documents that hold up are the ones that state the scope precisely, name what is excluded, put a date and an expiration on the price, and set payment terms before the work starts. Nearly every billing argument in the trades traces back to a missing exclusion.

Include your license number, the specific equipment or fixture models where they matter, and a short note on how change orders will be handled. Written change-order terms cost nothing to add and settle the conversation when a wall opens up and the job changes.

Markup Versus Margin

The markup column above adds a percentage to your cost. Margin is the share of the final price that is profit, and it is always the smaller number: a 50 percent markup produces a 33 percent margin, and a 100 percent markup produces 50 percent. Set targets in margin and enter markup here to reach them.

Frequently Asked Questions

What has to be on a contractor estimate?
At minimum: your business name and license number, the customer and job address, a dated scope of work, itemized or grouped pricing, what is explicitly excluded, payment terms, and how long the price is valid. Many states also require specific contract language above a dollar threshold, so check your local rules.
Should I show line-item pricing or one total?
Grouped pricing with a clear scope usually closes better than a fully itemized parts list, because an itemized estimate invites the customer to price-shop each part. Itemize when the customer is a property manager or general contractor who expects it.
What markup should I apply to materials?
Enough to cover procurement, stocking, warranty handling, and the risk of price changes — commonly 30 to 100 percent on parts depending on the item and the trade. Remember that markup and margin are different: a 50 percent markup is a 33 percent margin.
How long should an estimate stay valid?
Thirty days is the common default, and shorter when equipment or commodity pricing is volatile. Print the expiration on the estimate so a price from six months ago does not become an argument.

Stop Rebuilding These Numbers By Hand

JobOpsPro keeps your rates, price book, estimates, and job costing in one system — $25 per user per month, every module included.

Explore The Demo CompanySee How We Compare